Today on this trail
Is it open? No rider updates in the last 4 hours.
A blue at Revelstoke, Critical Path runs 1.5 miles with 4,557 ft of drop. The first pitches are the steepest, a headwall of 28° over 300 ft.
How it rates
SkiGrades rating
BlueBorderline black
A steep blue, right on the edge of black
Its steepest 300 ft is 27.5°: steeper than 95% of Western Canada blues, and close to a typical Western Canada black (26°). Too close to call it a black, so it stays a blue with a warning.
Steepness for a blue
The 2nd steepest of Revelstoke’s 25 blues
Critical Path 28° · typical blue here 24°
gentlersteeper
Steeper than 95% of blues across Western Canada
gentlersteeper
Sustained pitch
How much of the run stays close to its steepest pitch (within 4° of its steepest 300 ft). Five bars: steep nearly top to bottom. One bar: one short steep spot, the rest easier.- Steep top, then easier
- Length
- 7,917 ft, longer than 95% of blues
See every re-rated trail →Our rating is by steepness from elevation data, against Western Canada trails of the same color. Bumps, width and snow aren’t measured.
Sun and shade
It faces west: firmer in the morning, with sun from about 11:30, strongest around 2:45. A good one for the last laps.
Worked out from the way it faces and its pitch, for a clear day. Ridges and trees aren’t counted, so it can fall into shade sooner.